RECONSTRUCTION OF THE AMPHITHEATER BUILDING IN DUSHANBE, UZBEKISTAN (2010)
(in collaboration with "Proekt-KS")

Project: 2010
Authors:
A.Asadov, K.Saprichjan,
A.Shtanjuk,
A.Sandu
Annotation:
The project of amphitheater reconstruction supposes its capacity increase from 1250 up to 3000 seats, and also overlapping by a dome design.
occupancy has considerably increased, and visibility of a stage has much more improved as well due to the hall lay-out change. Additional spectator seats are situated in loges on level 4.500 (behind an arch facade), and also on a balcony [level 10.200].
From outside the hall is covered with a two-layer cover. The first layer is a light transmissive wall (manufactured from stained-glass windows or a TFT-film), protecting new foyer and passing in an opaque dome. The second layer is the openwork metal design forming external walking gallery.
The form a new amphitheater cover remind the traditional image of east dome, and the modern design gives transparency and depth to all construction.
Parameters :
total square - 8150 sq.m, occupancy - 3000 seats.





2 variant


|
|